1997
–
2005In 1997, the installation was started on 55.000m2 area on Nevşehir - Kaymaklı road.
In 1998, the factory of the German origin table machine was completed.
In 1999, Workshop department was opened.
In 2003, Logistics department was opened.
2. Factory installation was made for capacity increase in 2005.
The factory area was 150.000m2 until the end of 2005.
Bims washing plant was established in 2005.
-
2006
–
2010The export department was opened in 2007 and the export of the products started abroad.
In 2008, R & D activities in Turkey was first established last Ponza Screening and washing plant imported from Germany.
Pumice Packaging Facility was established in 2008.
Plaster Sand Plant was established in 2008.
Bims Calibration and Crushing Plant was established in 2009.
In 2010, an engineering department was created for R & D.
The factory area was 500.000m2 until the end of 2010.
-
2011
–
20153. Factory installation was made for capacity increase in 2011.
In 2012, the first National Technical Approval Certificate of the sector was taken.
In 2012 Lento Patent was taken and a production company was established.
4. Factory installed for capacity increase in 2013.
300 Kw Solar Power Plant was established in 2014.
210 Kw Solar Power Plant was established in 2015....
In 2015, Alum Sand Unit was established.
The factory area was 800.000m2 until the end of 2015.
-
2016
2. Pumice Screening Plant was established.
State-of-the-art technology for capacity expansion.
The basis of the latest technology pneumatic screening plant for capacity expansion was laid.
Vehicle departmanMaintenance department was opened in the factory.
Turkey has been the company's largest pumice mining licenses.
The factory area has been 1,000,000m2 until the end of 2016.
The workshop department was developed with new machinery and equipment and installed in a closed area of 1,000 m2.
Hakkımızda
Developed countries have taken advantage of the advantages of structural elements produced by pumice (pumice) and have evaluated the advantages and the labor force by directing them to new investments.
ERTAŞ GROUP is aware of this phenomenon; With its BLOKBİMS Insulated Lightweight Construction Elements factory, METAŞ Mining has set up raw material production facilities and entered the construction sector to provide better facilities and more perfect solutions.